The main challenge was how to correctly design the system to meet INJAZ’s needs and the ability to migrate the data from the old system to the LP+ ADOPT, but this challenge was overcome because of the dedication and cooperation of the LP+ system support team and their continuous follow-up.
Another main challenge was the downtime of the old system, which was overcome since the new system is built on Microsoft servers in integration with office 365. It also allows us to add new features and support the system easily.
For the INJAZ program development team, using the LP+ ADOPT studio was a great transition in INJAZ programs development by creating electronic versions of their work by enabling them to develop courses effectively and efficiently with the ability to edit, develop and reflect the learning material for students easily.
The system features and usage abilities helped our field office operation team in conducting their sessions and collecting all required course information easily.